ARCHIVED General Conditions - Higher Complexity - Goods

Attention! We’ve Moved! The Supply Manual has moved to the CanadaBuys website. Check out the new landing page for the Supply Manual.

As part of the Acquisitions Program’s transformation agenda, PSPC is planning to archive and migrate the SACC manual to the CanadaBuys website. The SACC manual will continue to be available on the BuyandSell website to ensure continuity of service during this transition period. At this time, an initial version of the archived version of the SACC has been posted on CanadaBuys. We encourage you to go visit the site and get comfortable with the new format of the SACC at the following:

Archived - Standard Acquisition Clauses and Conditions Manual | CanadaBuys

We appreciate your continued feedback and cooperation during this transition.

This information has been archived and replaced by General conditions: Higher Complexity - Goods (2022-12-01) 2030

Archived Content

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

Legal text for SACC item

01 Interpretation

02 Standard Clauses and Conditions

03 Powers of Canada

04 Status of the Contractor

05 Conduct of the Work

06 Subcontracts

07 Specifications

08 Condition of Material

09 Replacement of Specific Individuals

10 Time of the Essence

11 Excusable Delay

12 Inspection and Acceptance of the Work

13 Invoice Submission

14 Taxes

15 Transportation Costs

16 Transportation Carriers' Liability

17 Shipment Documentation

18 Payment Period

19 Interest on Overdue Accounts

20 Compliance with Applicable Laws

21 Ownership

22 Warranty

23 Confidentiality

24 Use and Translation of Written Material

25 Government Property

26 Liability

27 Intellectual Property Infringement and Royalties

28 Amendment and Waivers

29 Assignment

30 Suspension of the Work

31 Default by the Contractor

32 Termination for Convenience

33 Accounts and Audit

34 Right of Set-off

35 Notice

36 Conflict of Interest and Values and Ethics Codes for the Public Service

37 No Bribe

38 Survival

39 Severability

40 Successors and Assigns

41 Contingency Fees

42 International Sanctions

43 Integrity Provisions – Contract

44 Entire Agreement

2030 01 (2013-04-25) Interpretation

In the Contract, unless the context otherwise requires:

"Applicable Taxes" means the Goods and Services Tax (GST), the Harmonized Sales Tax (HST), and any provincial tax, by law, payable by Canada such as, the Quebec Sales Tax (QST) as of April 1, 2013;

"Articles of Agreement" means the clauses and conditions incorporated in full text or incorporated by reference from the Standard Acquisition Clauses and Conditions Manual to form the body of the Contract; it does not include these general conditions, any supplemental general conditions, annexes, the Contractor's bid or any other document;

"Canada", "Crown", "Her Majesty" or "the Government" means Her Majesty the Queen in right of Canada as represented by the Minister of Public Works and Government Services and any other person duly authorized to act on behalf of that minister or, if applicable, an appropriate minister to whom the Minister of Public Works and Government Services has delegated his or her powers, duties or functions and any other person duly authorized to act on behalf of that minister;

"Contract" means the Articles of Agreement, these general conditions, any supplemental general conditions, annexes and any other document specified or referred to as forming part of the Contract, all as amended by agreement of the Parties from time to time;

"Contracting Authority" means the person designated by that title in the Contract, or by notice to the Contractor, to act as Canada's representative to manage the Contract;

"Contractor" means the person, entity or entities named in the Contract to supply goods, services or both to Canada;

"Contract Price" means the amount stated in the Contract to be payable to the Contractor for the Work, exclusive of Applicable Taxes;

"Cost" means cost determined according to Contract Cost Principles 1031-2 as revised to the date of the bid solicitation or, if there was no bid solicitation, the date of the Contract;

"Government Property" means anything supplied to the Contractor by or on behalf of Canada for the purposes of performing the Contract and anything acquired by the Contractor in any manner in connection with the Work, the cost of which is paid by Canada under the Contract;

"Party" means Canada, the Contractor, or any other signatory to the Contract and "Parties" means all of them;

"Specifications" means the description of the essential, functional or technical requirements of the Work in the Contract, including the procedures for determining whether the requirements have been met;

Total Estimated Cost", “Revised Estimated Cost", “Increase (Decrease)” on Page 1 of the Contract or Contract Amendment means an amount used for internal administrative purposes only that comprises the Contract Price, or the revised Contract Price, or the amount that would increase or decrease the Contract Price and the Applicable Taxes as evaluated by the Contracting Authority, and does not constitute tax advice on the part of Canada;

"Work" means all the activities, services, goods, equipment, matters and things required to be done, delivered or performed by the Contractor under the Contract.

2030 02 (2008-05-12) Standard Clauses and Conditions

Pursuant to the Department of Public Works and Government Services Act, S.C. 1996, c. 16, the clauses and conditions identified by number, date and title in the Contract are incorporated by reference and form part of the Contract as though expressly set out in the Contract.

2030 03 (2008-05-12) Powers of Canada

All rights, remedies, powers and discretions granted or acquired by Canada under the Contract or by law are cumulative, not exclusive.

2030 04 (2008-05-12) Status of the Contractor

The Contractor is an independent contractor engaged by Canada to perform the Work. Nothing in the Contract is intended to create a partnership, a joint venture or an agency between Canada and the other Party or Parties. The Contractor must not represent itself as an agent or representative of Canada to anyone. Neither the Contractor nor any of its personnel is engaged as an employee or agent of Canada. The Contractor is responsible for all deductions and remittances required by law in relation to its employees.

2030 05 (2008-05-12) Conduct of the Work

  1. The Contractor represents and warrants that:
    1. it is competent to perform the Work;
    2. it has everything necessary to perform the Work, including the resources, facilities, labour, technology, equipment, and materials; and
    3. it has the necessary qualifications, including knowledge, skill, know-how and experience, and the ability to use them effectively to perform the Work.
  2. The Contractor must:
    1. perform the Work diligently and efficiently;
    2. except for Government Property, supply everything necessary to perform the Work;
    3. use, as a minimum, quality assurance procedures, inspections and controls generally used and recognized by the industry to ensure the degree of quality required by the Contract; and
    4. ensure that the Work is of proper quality, using appropriate material and workmanship and meets all the requirements of the Contract.
  3. Unless the Contracting Authority orders the Contractor to suspend the Work or part of the Work pursuant to section 30, the Contractor must not stop or suspend the Work or part of the Work pending the settlement of any dispute between the Parties about the Contract.
  4. The Contractor must provide all reports that are required by the Contract and any other information that Canada may reasonably require from time to time.
  5. The Contractor is fully responsible for performing the Work. Canada will not be responsible for any negative consequences or extra costs if the Contractor follows any advice given by Canada unless the Contracting Authority provides the advice to the Contractor in writing and includes a statement specifically relieving the Contractor of any responsibility for negative consequences or extra costs that might result from following the advice.

2030 06 (2013-06-27) Subcontracts

  1. Except as provided in subsection 2, the Contractor must obtain the Contracting Authority's written consent before subcontracting or permitting the subcontracting of any part of the Work. A subcontract includes a contract entered into by any subcontractor at any tier to perform any part of the Work.
  2. The Contractor is not required to obtain consent for subcontracts specifically authorized in the Contract. The Contractor may also without the consent of the Contracting Authority:
    1. purchase "off-the-shelf" items and any standard articles and materials that are ordinarily produced by manufacturers in the normal course of business;
    2. subcontract any incidental services that would ordinarily be subcontracted in performing the Work;
    3. in addition to purchases and services referred to in paragraphs (a) and (b), subcontract any part or parts of the Work to one or more subcontractors up to a total value of 40 percent of the Contract Price; and
    4. permit its subcontractors at any tier to make purchases or subcontract as permitted in paragraphs (a), (b) and (c).
  3. In any subcontract other than a subcontract referred to in paragraph 2.(a), the Contractor must, unless the Contracting Authority agrees in writing, ensure that the subcontractor is bound by conditions compatible with and, in the opinion of the Contracting Authority, not less favourable to Canada than the conditions of the Contract, with the exception of requirements under the Federal Contractors Program for employment equity which only apply to the Contractor.
  4. Even if Canada consents to a subcontract, the Contractor is responsible for performing the Contract and Canada is not responsible to any subcontractor. The Contractor is responsible for any matters or things done or provided by any subcontractor under the Contract and for paying any subcontractors for any part of the Work they perform.

2030 07 (2008-05-12) Specifications

  1. All Specifications provided by Canada or on behalf of Canada to the Contractor in connection with the Contract belong to Canada and must be used by the Contractor only for the purpose of performing the Work.
  2. If the Contract provides that Specifications furnished by the Contractor must be approved by Canada, that approval will not relieve the Contractor of its responsibility to meet all requirements of the Contract.

2030 08 (2008-05-12) Condition of Material

Unless provided otherwise in the Contract, material supplied must be new and conform to the latest issue of the applicable drawing, specifications and part number that is in effect on the bid closing date or, if there was no bid solicitation, the date of the Contract.

2030 09 (2008-05-12) Replacement of Specific Individuals

  1. If specific individuals are identified in the Contract to perform the Work, the Contractor must provide the services of those individuals unless the Contractor is unable to do so for reasons beyond its control.
  2. If the Contractor is unable to provide the services of any specific individual identified in the Contract, it must provide a replacement with similar qualifications and experience. The replacement must meet the criteria used in the selection of the Contractor and be acceptable to Canada. The Contractor must, as soon as possible, give notice to the Contracting Authority of the reason for replacing the individual and provide:
    1. the name, qualifications and experience of the proposed replacement; and
    2. proof that the proposed replacement has the required security clearance granted by Canada, if applicable.
  3. The Contractor must not, in any event, allow performance of the Work by unauthorized replacement persons. The Contracting Authority may order that a replacement stop performing the Work. In such a case, the Contractor must immediately comply with the order and secure a further replacement in accordance with subsection 2. The fact that the Contracting Authority does not order that a replacement stop performing the Work does not relieve the Contractor from its responsibility to meet the requirements of the Contract.

2030 10 (2008-05-12) Time of the Essence

It is essential that the Work be delivered within or at the time stated in the Contract.

2030 11 (2008-05-12) Excusable Delay

  1. A delay in the performance by the Contractor of any obligation under the Contract that is caused by an event that
    1. is beyond the reasonable control of the Contractor,
    2. could not reasonably have been foreseen,
    3. could not reasonably have been prevented by means reasonably available to the Contractor, and
    4. occurred without the fault or neglect of the Contractor,

    will be considered an "Excusable Delay" if the Contractor advises the Contracting Authority of the occurrence of the delay or of the likelihood of the delay as soon as the Contractor becomes aware of it. The Contractor must also advise the Contracting Authority, within fifteen (15) working days, of all the circumstances relating to the delay and provide to the Contracting Authority for approval a clear work around plan explaining in detail the steps that the Contractor proposes to take in order to minimize the impact of the event causing the delay.

  2. Any delivery date or other date that is directly affected by an Excusable Delay will be postponed for a reasonable time that will not exceed the duration of the Excusable Delay.
  3. However, if an Excusable Delay has continued for thirty (30) days or more, the Contracting Authority may, by giving notice in writing to the Contractor, terminate the Contract. In such a case, the Parties agree that neither will make any claim against the other for damages, costs, expected profits or any other loss arising out of the termination or the event that contributed to the Excusable Delay. The Contractor agrees to repay immediately to Canada the portion of any advance payment that is unliquidated at the date of the termination.
  4. Unless Canada has caused the delay by failing to meet an obligation under the Contract, Canada will not be responsible for any costs incurred by the Contractor or any of its subcontractors or agents as a result of an Excusable Delay.
  5. If the Contract is terminated under this section, the Contracting Authority may require the Contractor to deliver to Canada, in the manner and to the extent directed by the Contracting Authority, any completed parts of the Work not delivered and accepted before the termination and anything that the Contractor has acquired or produced specifically to perform the Contract. Canada will pay the Contractor:
    1. the value, of all completed parts of the Work delivered to and accepted by Canada, based on the Contract Price, including the proportionate part of the Contractor's profit or fee included in the Contract Price; and
    2. the Cost to the Contractor that Canada considers reasonable in respect of anything else delivered to and accepted by Canada.

    The total amount paid by Canada under the Contract to the date of termination and any amounts payable under this subsection must not exceed the Contract Price.

2030 12 (2008-05-12) Inspection and Acceptance of the Work

  1. All the Work is subject to inspection and acceptance by Canada. Inspection and acceptance of the Work by Canada do not relieve the Contractor of its responsibility for defects or other failures to meet the requirements of the Contract. Canada will have the right to reject any work that is not in accordance with the requirements of the Contract and require its correction or replacement at the Contractor's expense.
  2. The Contractor must provide representatives of Canada access to all locations where any part of the Work is being performed at any time during working hours. Representatives of Canada may make examinations and such tests of the Work as they may think fit. The Contractor must provide all assistance and facilities, test pieces, samples and documentation that the representatives of Canada may reasonably require for the carrying out of the inspection. The Contractor must forward such test pieces and samples to such person or location as Canada specifies.
  3. The Contractor must inspect and approve any part of the Work before submitting it for acceptance or delivering it to Canada. The Contractor must keep accurate and complete inspection records that must be made available to Canada on request. Representatives of Canada may make copies and take extracts of the records during the performance of the Contract and for up to three (3) years after the end of the Contract.

2030 13 (2013-03-21) Invoice Submission

  1. Invoices must be submitted in the Contractor's name. The Contractor must submit invoices for each delivery or shipment; invoices must only apply to the Contract. Each invoice must indicate whether it covers partial or final delivery.
  2. Invoices must show:
    1. the date, the name and address of the client department, item or reference numbers, deliverable/description of the Work, contract number, Client Reference Number (CRN), Procurement Business Number (PBN), and financial code(s);
    2. details of expenditures (such as item, quantity, unit of issue, unit price, fixed time labour rates and level of effort, subcontracts, as applicable) in accordance with the Basis of Payment, exclusive of Applicable Taxes;
    3. deduction for holdback, if applicable;
    4. the extension of the totals, if applicable; and
    5. if applicable, the method of shipment together with date, case numbers and part or reference numbers, shipment charges and any other additional charges.
  3. Applicable Taxes must be specified on all invoices as a separate item along with corresponding registration numbers from the tax authorities. All items that are zero-rated, exempt or to which Applicable Taxes do not apply, must be identified as such on all invoices.
  4. By submitting an invoice, the Contractor certifies that the invoice is consistent with the Work delivered and is in accordance with the Contract.

2030 14 (2013-03-21) Taxes

  1. Federal government departments and agencies are required to pay Applicable Taxes.
  2. Applicable Taxes will be paid by Canada as provided in the Invoice Submission section. It is the sole responsibility of the Contractor to charge Applicable Taxes at the correct rate in accordance with applicable legislation. The Contractor agrees to remit to appropriate tax authorities any amounts of Applicable Taxes paid or due.
  3. The Contractor is not entitled to use Canada’s exemptions from any tax, such as provincial sales taxes, unless otherwise specified by law. The Contractor must pay applicable provincial sales tax, ancillary taxes, and any commodity tax, on taxable goods or services used or consumed in the performance of the Contract (in accordance with applicable legislation), including for material incorporated into real property.
  4. In those cases where Applicable Taxes, customs duties, and excise taxes are included in the Contract Price, the Contract Price will be adjusted to reflect any increase, or decrease, of Applicable Taxes, customs duties, and excise taxes that will have occurred between bid submission and contract award. However, there will be no adjustment for any change to increase the Contract Price if public notice of the change was given before bid submission date in sufficient detail to have permitted the Contractor to calculate the effect of the change.
  5. Tax Withholding of 15 Percent – Canada Revenue Agency

    Pursuant to the Income Tax Act, 1985, c. 1 (5th Supp.) and the Income Tax Regulations, Canada must withhold 15 percent of the amount to be paid to the Contractor in respect of services provided in Canada if the Contractor is not a resident of Canada, unless the Contractor obtains a valid waiver from the Canada Revenue Agency. The amount withheld will be held on account for the Contractor in respect to any tax liability which may be owed to Canada.

2030 15 (2010-01-11) Transportation Costs

If transportation costs are payable by Canada under the Contract and the Contractor makes the transportation arrangements, shipments must be made by the most direct and economical means consistent with normal shipping practice. The costs must be shown as a separate item on the invoice.

2030 16 (2010-01-11) Transportation Carriers' Liability

The federal government's policy of underwriting its own risks precludes payment of insurance or valuation charges for transportation beyond the point at which ownership of goods passes to the federal government (determined by the FOB point or Incoterms). Where increased carrier liability is available without charge, the Contractor must obtain the increased liability for shipment.

2030 17 (2008-05-12) Shipment Documentation

For the shipment of goods, the transportation bill of lading must accompany the original invoice, except for "collect" shipments (if and when stipulated), in which event it must accompany the shipment. In addition, a packing slip must accompany each shipment, showing item, quantity, part or reference numbers, description of the goods and contract number, including the CRN and PBN. If the goods have been inspected at the Contractor's plant, the signed inspection voucher must be attached to the packing slip normally enclosed in the packing note envelope.

2030 18 (2008-05-12) Payment Period

  1. Canada's standard payment period is thirty (30) days. The payment period is measured from the date an invoice in acceptable form and content is received in accordance with the Contract or the date the Work is delivered in acceptable condition as required in the Contract, whichever is later. A payment is considered overdue on the 31st day following that date and interest will be paid automatically in accordance with section 19.
  2. If the content of the invoice and its substantiating documentation are not in accordance with the Contract or the Work is not in acceptable condition, Canada will notify the Contractor within fifteen (15) days of receipt. The 30-day payment period begins upon receipt of the revised invoice or the replacement or corrected Work. Failure by Canada to notify the Contractor within fifteen (15) days will only result in the date specified in subsection 1 to apply for the sole purpose of calculating interest on overdue accounts.

2030 19 (2008-12-12) Interest on Overdue Accounts

  1. For the purpose of this section:

    "Average Rate" means the simple arithmetic mean of the Bank Rates in effect at 4:00 p.m. Eastern Time each day during the calendar month immediately before the calendar month in which payment is made;

    "Bank Rate" means the rate of interest established from time to time by the Bank of Canada as the minimum rate at which the Bank of Canada makes short term advances to members of the Canadian Payments Association;

    "date of payment" means the date of the negotiable instrument drawn by the Receiver General for Canada to pay any amount under the Contract;

    an amount becomes "overdue" when it is unpaid on the first day following the day on which it is due and payable according to the Contract.

  2. Canada will pay to the Contractor simple interest at the Average Rate plus 3 percent per year on any amount that is overdue, from the date that amount becomes overdue until the day before the date of payment, inclusive. The Contractor is not required to provide notice to Canada for interest to be payable.
  3. Canada will pay interest in accordance with this section only if Canada is responsible for the delay in paying the Contractor. Canada will not pay interest on overdue advance payments.

2030 20 (2008-05-12) Compliance with Applicable Laws

  1. The Contractor must comply with all laws applicable to the performance of the Contract. The Contractor must provide evidence of compliance with such laws to Canada at such times as Canada may reasonably request.
  2. The Contractor must obtain and maintain at its own cost all permits, licenses, regulatory approvals and certificates required to perform the Work. If requested by the Contracting Authority, the Contractor must provide a copy of any required permit, license, regulatory approvals or certificate to Canada.

2030 21 (2008-05-12) Ownership

  1. Unless provided otherwise in the Contract, the Work or any part of the Work belongs to Canada after delivery and acceptance by or on behalf of Canada.
  2. However if any payment is made to the Contractor for or on account of any work, either by way of progress or milestone payments, that work paid for by Canada belongs to Canada upon such payment being made. This transfer of ownership does not constitute acceptance by Canada of the Work or any part of the Work and does not relieve the Contractor of its obligation to perform the Work in accordance with the Contract.
  3. Despite any transfer of ownership, the Contractor is responsible for any loss or damage to the Work or any part of the Work until it is delivered to Canada in accordance with the Contract. Even after delivery, the Contractor remains responsible for any loss or damage to any part of the Work caused by the Contractor or any subcontractor.
  4. Upon transfer of ownership to the Work or any part of the Work to Canada, the Contractor must, if requested by Canada, establish to Canada's satisfaction that the title is free and clear of all claims, liens, attachments, charges or encumbrances. The Contractor must execute any conveyances and other instruments necessary to perfect the title that Canada may require.

2030 22 (2008-05-12) Warranty

  1. Despite inspection and acceptance of the Work by or on behalf of Canada and without restricting any other provision of the Contract or any condition, warranty or provision imposed by law, the Contractor warrants that, for twelve (12) months (or any other period stated in the Contract), the Work will be free from all defects in design, material or workmanship, and will conform to the requirements of the Contract. The warranty period begins on the date of delivery, or if acceptance takes place at a later date, the date of acceptance. With respect to Government Property not supplied by the Contractor, the Contractor's warranty will extend only to its proper incorporation into the Work.
  2. In the event of a defect or non-conformance in any part of the Work during the warranty period, the Contractor, at the request of Canada to do so, must as soon as possible repair, replace or otherwise make good at its own option and expense the part of the Work found to be defective or not in conformance with the requirements of the Contract.
  3. The Work or any part of the Work found to be defective or non-conforming will be returned to the Contractor's plant for replacement, repair or making good. However, when in the opinion of Canada it is not expedient to remove the Work from its location, the Contractor must carry out any necessary repair or making good of the Work at that location. In such cases, the Contractor will be paid the fair and reasonable Cost (including reasonable travel and living expenses) incurred in so doing, with no allowance for profit, less an amount equal to the Cost of rectifying the defect or non-conformance at the Contractor's plant.
  4. Canada must pay the transportation cost associated with returning the Work or any part of the Work to the Contractor's plant pursuant to subsection 3. The Contractor must pay the transportation cost associated with forwarding the replacement or returning the Work or part of the Work when rectified to the delivery point specified in the Contract or to another location directed by Canada.
  5. The Contractor must remedy all data and reports pertaining to any correction or replacement under this section, including revisions and updating of all affected data, manuals, publications, software and drawings called for under the Contract, at no cost to Canada.
  6. If the Contractor fails to fulfill any obligation described in this section within a reasonable time of receiving a notice, Canada will have the right to remedy or to have remedied the defective or non-conforming work at the Contractor's expense. If Canada does not wish to correct or replace the defective or non-conforming work, an equitable reduction will be made in the Contract Price.
  7. The warranty period is automatically extended by the duration of any period or periods where the Work is unavailable for use or cannot be used because of a defect or non-conformance during the original warranty period. The warranty applies to any part of the Work repaired, replaced or otherwise made good pursuant to subsection 2, for the greater of:
    1. the warranty period remaining, including the extension, or
    2. ninety (90) days or such other period as may be specified for that purpose by agreement between the Parties.

2030 23 (2008-05-12) Confidentiality

  1. The Contractor must keep confidential all information provided to the Contractor by or on behalf of Canada in connection with the Work, including any information that is confidential or proprietary to third parties, and all information conceived, developed or produced by the Contractor as part of the Work when copyright or any other intellectual property rights in such information belongs to Canada under the Contract. The Contractor must not disclose any such information without the written permission of Canada. The Contractor may disclose to a subcontractor any information necessary to perform the subcontract as long as the subcontractor agrees to keep the information confidential and that it will be used only to perform the subcontract.
  2. The Contractor agrees to use any information provided to the Contractor by or on behalf of Canada only for the purpose of the Contract. The Contractor acknowledges that all this information remains the property of Canada or the third party, as the case may be. Unless provided otherwise in the Contract, the Contractor must deliver to Canada all such information, together with every copy, draft, working paper and note that contains such information, upon completion or termination of the Contract or at such earlier time as Canada may require.
  3. Subject to the Access to Information Act, R.S.C. 1985, c. A-1, and to any right of Canada under the Contract to release or disclose, Canada must not release or disclose outside the Government of Canada any information delivered to Canada under the Contract that is proprietary to the Contractor or a subcontractor.
  4. The obligations of the Parties set out in this section do not apply to any information if the information:
    1. is publicly available from a source other than the other Party; or
    2. is or becomes known to a Party from a source other than the other Party, except any source that is known to be under an obligation to the other Party not to disclose the information; or
    3. is developed by a Party without use of the information of the other Party.
  5. Wherever possible, the Contractor must mark or identify any proprietary information delivered to Canada under the Contract as "Property of (Contractor's name), permitted Government uses defined under Public Works and Government Services (PWGSC) Contract No. (fill in Contract Number)". Canada will not be liable for any unauthorized use or disclosure of information that could have been so marked or identified and was not.
  6. If the Contract, the Work, or any information referred to in subsection 1 is identified as TOP SECRET, SECRET, CONFIDENTIAL, or PROTECTED by Canada, the Contractor must at all times take all measures reasonably necessary for the safeguarding of the material so identified, including those set out in the PWGSC Industrial Security Manual and its supplements and any other instructions issued by Canada.
  7. If the Contract, the Work, or any information referred to in subsection 1 is identified as TOP SECRET, SECRET, CONFIDENTIAL, or PROTECTED, by Canada, representatives of Canada are entitled to inspect the Contractor's premises and the premises of a subcontractor at any tier for security purposes at any time during the term of the Contract. The Contractor must comply with, and ensure that any subcontractor complies with, all written instructions issued by Canada dealing with the material so identified, including any requirement that employees of the Contractor or of any subcontractor execute and deliver declarations relating to reliability screenings, security clearances and other procedures.

2030 24 (2008-05-12) Use and Translation of Written Material

  1. Unless provided otherwise in the Contract, copyright in any written material used, produced or delivered under the Contract belongs to its author or rightful owner. Canada has the right to use, copy and disclose, for government purposes, the written material related to the Work that is delivered to Canada.
  2. If the Contract does not require the delivery of any written material in both of Canada's official languages, Canada may translate the written material into the other official language. The Contractor acknowledges that Canada owns the rights on the translation and that Canada is under no obligation to provide the translation to the Contractor. Canada agrees that any translation must include any copyright and any proprietary right notice that was part of the original. Canada acknowledges that the Contractor is not responsible for any technical errors or other problems that may arise as a result of the translation.

2030 25 (2008-05-12) Government Property

  1. All Government Property must be used by the Contractor solely for the purpose of the Contract and remains the property of Canada. The Contractor must maintain adequate accounting records of all Government Property and, whenever feasible, mark it as being the property of Canada.
  2. The Contractor must take reasonable and proper care of all Government Property while it is in its possession or subject to its control. The Contractor is responsible for any loss or damage resulting from its failure to do so other than loss or damage caused by ordinary wear and tear.
  3. All Government Property, unless it is installed or incorporated in the Work, must be returned to Canada on demand. All scrap and all waste materials, articles or things that are Government Property must, unless provided otherwise in the Contract, remain the property of Canada and must be disposed of only as directed by Canada.
  4. At the time of completion of the Contract, and if requested by the Contracting Authority, the Contractor must provide to Canada an inventory of all Government Property relating to the Contract.

2030 26 (2008-05-12) Liability

The Contractor is liable for any damage caused by the Contractor, its employees, subcontractors, or agents to Canada or any third party. Canada is liable for any damage caused by Canada, its employees or agents to the Contractor or any third party. The Parties agree that no limitation of liability or indemnity provision applies to the Contract unless it is specifically incorporated in full text in the Articles of Agreement. Damage includes any injury to persons (including injury resulting in death) or loss of or damage to property (including real property) caused as a result of or during the performance of the Contract.

2030 27 (2008-05-12) Intellectual Property Infringement and Royalties

  1. The Contractor represents and warrants that, to the best of its knowledge, neither it nor Canada will infringe any third party's intellectual property rights in performing or using the Work, and that Canada will have no obligation to pay royalties of any kind to anyone in connection with the Work.
  2. If anyone makes a claim against Canada or the Contractor concerning intellectual property infringement or royalties related to the Work, that Party agrees to notify the other Party in writing immediately. If anyone brings a claim against Canada, according to Department of Justice Act, R.S. 1985, c. J-2, the Attorney General of Canada must have the regulation and conduct of all litigation for or against Canada, but the Attorney General may request that the Contractor defend Canada against the claim. In either case, the Contractor agrees to participate fully in the defence and any settlement negotiations and to pay all costs, damages and legal costs incurred or payable as a result of the claim, including the amount of any settlement. Both Parties agree not to settle any claim unless the other Party first approves the settlement in writing.
  3. The Contractor has no obligation regarding claims that were only made because:
    1. Canada modified the Work or part of the Work without the Contractor's consent or used the Work or part of the Work without following a requirement of the Contract; or
    2. Canada used the Work or part of the Work with a product that the Contractor did not supply under the Contract (unless that use is described in the Contract or the manufacturer's specifications); or
    3. the Contractor used equipment, drawings, specifications or other information supplied to the Contractor by Canada (or by someone authorized by Canada); or
    4. the Contractor used a specific item of equipment or software that it obtained because of specific instructions from the Contracting Authority; however, this exception only applies if the Contractor has included the following language in its own contract with the supplier of that equipment or software: "[Supplier name] acknowledges that the purchased items will be used by the Government of Canada. If a third party claims that equipment or software supplied under this contract infringes any intellectual property right, [supplier name], if requested to do so by either [Contractor name] or Canada, will defend both [Contractor name] and Canada against that claim at its own expense and will pay all costs, damages and legal fees payable as a result of that infringement." Obtaining this protection from the supplier is the Contractor's responsibility and, if the Contractor does not do so, it will be responsible to Canada for the claim.
  4. If anyone claims that, as a result of the Work, the Contractor or Canada is infringing its intellectual property rights, the Contractor must immediately do one of the following:
    1. take whatever steps are necessary to allow Canada to continue to use the allegedly infringing part of the Work; or
    2. modify or replace the Work to avoid intellectual property infringement, while ensuring that the Work continues to meet all the requirements of the Contract; or
    3. take back the Work and refund any part of the Contract Price that Canada has already paid.

    If the Contractor determines that none of these alternatives can reasonably be achieved, or if the Contractor fails to take any of these steps within a reasonable amount of time, Canada may choose either to require the Contractor to do (c), or to take whatever steps are necessary to acquire the rights to use the allegedly infringing part(s) of the Work itself, in which case the Contractor must reimburse Canada for all the costs it incurs to do so.

2030 28 (2008-05-12) Amendment and Waivers

  1. To be effective, any amendment to the Contract must be done in writing by the Contracting Authority and the authorized representative of the Contractor.
  2. While the Contractor may discuss any proposed modifications to the Work with other representatives of Canada, Canada will not be responsible for the cost of any modification unless it has been incorporated into the Contract in accordance with subsection 1.
  3. A waiver will only be valid, binding or affect the rights of the Parties if it is made in writing by, in the case of a waiver by Canada, the Contracting Authority and, in the case of a waiver by the Contractor, the authorized representative of the Contractor.
  4. The waiver by a Party of a breach of any condition of the Contract will not be treated or interpreted as a waiver of any subsequent breach and therefore will not prevent that Party from enforcing of that term or condition in the case of a subsequent breach.

2030 29 (2008-05-12) Assignment

  1. The Contractor must not assign the Contract without first obtaining the written consent of the Contracting Authority. Any assignment made without that consent is void and will have no effect. The assignment will be effective upon execution of an assignment agreement signed by the Parties and the assignee.
  2. Assignment of the Contract does not relieve the Contractor from any obligation under the Contract and it does not impose any liability upon Canada.

2030 30 (2008-05-12) Suspension of the Work

  1. The Contracting Authority may at any time, by written notice, order the Contractor to suspend or stop the Work or part of the Work under the Contract for a period of up to one hundred eighty (180) days. The Contractor must immediately comply with any such order in a way that minimizes the cost of doing so. While such an order is in effect, the Contractor must not remove any part of the Work from any premises without first obtaining the written consent of the Contracting Authority. Within these one hundred eighty (180) days, the Contracting Authority must either cancel the order or terminate the Contract, in whole or in part, under section 31 or section 32.
  2. When an order is made under subsection 1, unless the Contracting Authority terminates the Contract by reason of default by the Contractor or the Contractor abandons the Contract, the Contractor will be entitled to be paid its additional costs incurred as a result of the suspension plus a fair and reasonable profit.
  3. When an order made under subsection 1 is cancelled, the Contractor must resume work in accordance with the Contract as soon as practicable. If the suspension has affected the Contractor's ability to meet any delivery date under the Contract, the date for performing the part of the Work affected by the suspension will be extended for a period equal to the period of suspension plus a period, if any, that in the opinion of the Contracting Authority, following consultation with the Contractor, is necessary for the Contractor to resume the Work. Any equitable adjustments will be made as necessary to any affected conditions of the Contract.

2030 31 (2010-08-16) Default by the Contractor

  1. If the Contractor is in default in carrying out any of its obligations under the Contract, the Contracting Authority may, by giving written notice to the Contractor, terminate for default the Contract or part of the Contract. The termination will take effect immediately or at the expiration of a cure period specified in the notice, if the Contractor has not cured the default to the satisfaction of the Contracting Authority within that cure period.
  2. If the Contractor becomes bankrupt or insolvent, makes an assignment for the benefit of creditors, or takes the benefit of any statute relating to bankrupt or insolvent debtors, or if a receiver is appointed under a debt instrument or a receiving order is made against the Contractor, or an order is made or a resolution passed for the winding down of the Contractor, the Contracting Authority may, to the extent permitted by the laws of Canada, by giving written notice to the Contractor, immediately terminate for default the Contract or part of the Contract.
  3. If Canada gives notice under subsection 1 or 2, the Contractor will have no claim for further payment except as provided in this section. The Contractor will be liable to Canada for any amounts paid by Canada, including milestone payments, and for all losses and damages suffered by Canada because of the default or occurrence upon which the notice was based, including any increase in the cost incurred by Canada in procuring the Work from another source. The Contractor agrees to repay immediately to Canada the portion of any advance payment that is unliquidated at the date of the termination.
  4. Upon termination of the Contract under this section, the Contracting Authority may require the Contractor to deliver to Canada, in the manner and to the extent directed by the Contracting Authority, any completed parts of the Work, not delivered and accepted before the termination and anything the Contractor has acquired or produced specifically to perform the Contract. In such a case, subject to the deduction of any claim that Canada may have against the Contractor arising under the Contract or out of the termination, Canada will pay or credit to the Contractor:
    1. the value, of all completed parts of the Work delivered to and accepted by Canada, based on the Contract Price, including the proportionate part of the Contractor's profit or fee included in the Contract Price; and
    2. the cost to the Contractor that Canada considers reasonable in respect of anything else delivered to and accepted by Canada.

      The total amount paid by Canada under the Contract to the date of the termination and any amount payable under this subsection must not exceed the Contract Price.

  5. Title to everything for which payment is made to the Contractor will, once payment is made, pass to Canada unless it already belongs to Canada under any other provision of the Contract.
  6. If the Contract is terminated for default under subsection 1, but it is later determined that grounds did not exist for a termination for default, the notice will be considered a notice of termination for convenience issued under subsection 1 of section 32.

2030 32 (2008-05-12) Termination for Convenience

  1. At any time before the completion of the Work, the Contracting Authority may, by giving notice in writing to the Contractor, terminate for convenience the Contract or part of the Contract. Once such a notice of termination for convenience is given, the Contractor must comply with the requirements of the termination notice. If the Contract is terminated in part only, the Contractor must proceed to complete any part of the Work that is not affected by the termination notice. The termination will take effect immediately or, as the case may be, at the time specified in the termination notice.
  2. If a termination notice is given pursuant to subsection 1, the Contractor will be entitled to be paid, for costs that have been reasonably and properly incurred to perform the Contract to the extent that the Contractor has not already been paid or reimbursed by Canada. The Contractor will be paid:
    1. on the basis of the Contract Price, for all completed work that is inspected and accepted in accordance with the Contract, whether completed before, or after the termination in accordance with the instructions contained in the termination notice;
    2. the Cost to the Contractor plus a fair and reasonable profit for all work terminated by the termination notice before completion; and
    3. all costs incidental to the termination of the Work incurred by the Contractor but not including the cost of severance payments or damages to employees whose services are no longer required, except wages that the Contractor is obligated by statute to pay.
  3. Canada may reduce the payment in respect of any part of the Work, if upon inspection, it does not meet the requirements of the Contract.
  4. The total of the amounts, to which the Contractor is entitled to be paid under this section, together with any amounts paid, due or becoming due to the Contractor must not exceed the Contract Price. The Contractor will have no claim for damages, compensation, loss of profit, allowance arising out of any termination notice given by Canada under this section except to the extent that this section expressly provides. The Contractor agrees to repay immediately to Canada the portion of any advance payment that is unliquidated at the date of the termination.

2030 33 (2008-05-12) Accounts and Audit

  1. The Contractor must keep proper accounts and records of the cost of performing the Work and of all expenditures or commitments made by the Contractor in connection with the Work, including all invoices, receipts and vouchers. The Contractor must retain records, including bills of lading and other evidence of transportation or delivery, for all deliveries made under the Contract.
  2. If the Contract includes payment for time spent by the Contractor, its employees, representatives, agents or subcontractors performing the Work, the Contractor must keep a record of the actual time spent each day by each individual performing any part of the Work.
  3. Unless Canada has consented in writing to its disposal, the Contractor must retain all the information described in this section for six (6) years after it receives the final payment under the Contract, or until the settlement of all outstanding claims and disputes, whichever is later. During this time, the Contractor must make this information available for audit, inspection and examination by the representatives of Canada, who may make copies and take extracts. The Contractor must provide all reasonably required facilities for any audit and inspection and must furnish all the information as the representatives of Canada may from time to time require to perform a complete audit of the Contract.
  4. The amount claimed under the contract, calculated in accordance with the Basis of Payment provision in the Articles of Agreement, is subject to government audit both before and after payment is made. If an audit is performed after payment, the Contractor agrees to repay any overpayment immediately on demand by Canada. Canada may hold back, deduct and set off any credits owing and unpaid under this section from any money that Canada owes to the Contractor at any time (including under other contracts). If Canada does not choose to exercise this right at any given time, Canada does not lose this right.

2030 34 (2008-05-12) Right of Set-off

Without restricting any right of set-off given by law, Canada may set-off against any amount payable to the Contractor under the Contract, any amount payable to Canada by the Contractor under the Contract or under any other current contract. Canada may, when making a payment pursuant to the Contract, deduct from the amount payable to the Contractor any such amount payable to Canada by the Contractor which, by virtue of the right of set-off, may be retained by Canada.

2030 35 (2008-05-12) Notice

Any notice under the Contract must be in writing and may be delivered by hand, courier, mail, facsimile or other electronic method that provides a paper record of the text of the notice. It must be sent to the Party for whom it is intended at the address stated in the Contract. Any notice will be effective on the day it is received at that address. Any notice to Canada must be delivered to the Contracting Authority.

2030 36 (2008-05-12) Conflict of Interest and Values and Ethics Codes for the Public Service

The Contractor acknowledges that individuals who are subject to the provisions of the Conflict of Interest Act, 2006, c. 9, s. 2, the Conflict of Interest Code for Members of the House of Commons, the Values and Ethics Code for the Public Service or all other codes of values and ethics applicable within specific organizations cannot derive any direct benefit resulting from the Contract.

2030 37 (2008-05-12) No Bribe

The Contractor declares that no bribe, gift, benefit, or other inducement has been or will be paid, given, promised or offered directly or indirectly to any official or employee of Canada or to a member of the family of such a person, with a view to influencing the entry into the Contract or the administration of the Contract.

2030 38 (2008-05-12) Survival

All the Parties' obligations of confidentiality, representations and warranties set out in the Contract as well as the provisions, which by the nature of the rights or obligations might reasonably be expected to survive, will survive the expiry or termination of the Contract.

2030 39 (2008-05-12) Severability

If any provision of the Contract is declared by a court of competent jurisdiction to be invalid, illegal or unenforceable, that provision will be removed from the Contract without affecting any other provision of the Contract.

2030 40 (2008-05-12) Successors and Assigns

The Contract is to the benefit of and binds the successors and permitted assignees of Canada and of the Contractor.

2030 41 (2008-12-12) Contingency Fees

The Contractor certifies that it has not, directly or indirectly, paid or agreed to pay and agrees that it will not, directly or indirectly, pay a contingency fee for the solicitation, negotiation or obtaining of the Contract to any person, other than an employee of the Contractor acting in the normal course of the employee's duties. In this section, "contingency fee" means any payment or other compensation that depends or is calculated based on a degree of success in soliciting, negotiating or obtaining the Contract and "person" includes any individual who is required to file a return with the registrar pursuant to section 5 of the Lobbying Act, 1985, c. 44 (4th Supplement).

2030 42 (2012-07-16) International Sanctions

  1. Persons in Canada, and Canadians outside of Canada, are bound by economic sanctions imposed by Canada. As a result, the Government of Canada cannot accept delivery of goods or services that originate, either directly or indirectly, from the countries or persons subject to economic sanctions.
  2. The Contractor must not supply to the Government of Canada any goods or services which are subject to economic sanctions.
  3. The Contractor must comply with changes to the regulations imposed during the period of the Contract. The Contractor must immediately advise Canada if it is unable to perform the Work as a result of the imposition of economic sanctions against a country or person or the addition of a good or service to the list of sanctioned goods or services. If the Parties cannot agree on a work around plan, the Contract will be terminated for the convenience of Canada in accordance with section 32.

2030 43 (2014-03-01) Integrity Provisions – Contract

    1. The Contractor agrees to comply with the Code of Conduct for Procurement and to be bound by its terms. In addition, the Contractor must also comply with the terms set out in these Integrity Provisions.
    2. The Contractor confirms that it understands that, to ensure fairness, openness and transparency in the procurement process, the commission of certain acts or offences may result in a termination for default under the Contract. If the Contractor made a false declaration in its bid, makes a false declaration under the Contract, fails to diligently maintain up-to-date the information requested, or if the Contractor or any of the Contractor's Affiliates fail to remain free and clear of any acts or convictions specified in these Integrity Provisions during the contract period, such false declaration or failure to comply may result, following a notice period, in a termination for default under the Contract. The Contractor understands that a termination for default will not restrict Canada’s right to exercise any other remedies that may be available against the Contractor and agrees to immediately return any advance payments.
    3. Affiliates
      For the purpose of these Integrity Provisions, everyone, including but not limited to organizations, bodies corporate, societies, companies, firms, partnerships, associations of persons, parent companies and subsidiaries, whether partly or wholly-owned, as well as individuals and directors, are Contractor's Affiliates if:
      1. directly or indirectly either one controls or has the power to control the other, or
      2. a third party has the power to control both.
      Indicia of control, include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities and equipment, common use of employees, or a business entity created following the acts or convictions specified in these Integrity Provisions which has the same or similar management, ownership, or principal employees, as the case may be.
    4. The Contractor who is incorporated or who is a sole proprietorship has already provided a list of names of all individuals who are directors of the Contractor or the name of the owner. The Contractor who has submitted a bid as a joint venture has already provided a list of names of all directors, or the name of the owner, for each member of the joint venture. The Contractor must diligently inform Canada in writing of any changes affecting the list of names of directors during the contract period. The Contractor must also, when requested, provide Canada with properly completed and signed consent forms and associated information, and cooperate to the verification process.
    5. The Contractor certifies that it is aware, and its Affiliates are aware that Canada may verify the information provided by the Contractor, including the information relating to the acts or convictions specified in these Integrity Provisions through independent research, use of any government resources or by contacting third parties.
    6. The Contractor certifies that neither the Contractor nor any of the Contractor's Affiliates have directly or indirectly, paid or agreed to pay, and will not, directly or indirectly, pay a contingency fee to any individual for the solicitation, negotiation or obtaining of the Contract if the payment of the fee would require the individual to file a return under section 5 of the Lobbying Act.
    7. Time Period
      The Time Period is 10 years and is measured from the date of the conviction or from the date of the conditional or absolute discharge.
      In addition, for a conviction under paragraphs a. or b. of subsection 8, following the 10-year period, a pardon or a record suspension must have been obtained, or capacities must have been restored by the Governor in Council. The Contractor must therefore provide a copy of confirming documentation from an official source for its certification to be found true by Canada for the purpose of these Integrity Provisions.
    8. The Contractor certifies that neither the Contractor nor any of the Contractor’s Affiliates have been convicted of an offence or received a conditional or an absolute discharge under any of the following provisions, unless the time period, as defined in the Time Period subsection, has elapsed:
      1. paragraph 80(1)(d) (False entry, certificate or return), subsection 80(2) (Fraud against Her Majesty) or section 154.01 (Fraud against Her Majesty) of the Financial Administration Act, or
      2. section 121 (Frauds on the government and Contractor subscribing to election fund), section 124 (Selling or Purchasing Office), section 380 (Fraud) for fraud committed against Her Majesty or section 418 (Selling defective stores to Her Majesty) of the Criminal Code, or
      3. section 119 (Bribery of judicial officers, etc), section 120 (Bribery of officers), section 346 (Extortion), sections 366 to 368 (Forgery and other offences resembling forgery), section 382 (Fraudulent manipulation of stock exchange transactions), section 382.1 (Prohibited insider trading), section 397 (Falsification of books and documents), section 422 (Criminal breach of contract), section 426 (Secret commissions), section 462.31 (Laundering proceeds of crime) or sections 467.11 to 467.13 (Participation in activities of criminal organization) of the Criminal Code, or
      4. section 45 (Conspiracies, agreements or arrangements between competitors), section 46 (Foreign directives), section 47 (Bid rigging), section 49 (Agreements or arrangements of federal financial institutions), section 52 (False or misleading representation), section 53 (Deceptive notice of winning a prize) of the Competition Act, or
      5. section 239 (False or deceptive statements) of the Income Tax Act, or
      6. section 327 (False or deceptive statements) of the Excise Tax Act, or
      7. section 3 (Bribing a foreign public official), section 4 (Accounting), or section 5 (Offence committed outside Canada) of the Corruption of Corruption of Foreign Public Officials Act, or
      8. section 5 (Trafficking in substance), section 6 (Importing and exporting), or section 7 (Production of substance) of the Controlled Drugs and Substance Act.
      The Contractor also certifies that no one convicted under any of the provisions under a. or b. are to receive any benefit under the Contract, unless a pardon or a record suspension has been obtained or capacities restored by the Governor in Council, as defined in the Time Period subsection.
    9. Foreign Offences
      The Contractor also certifies that, within a period, as defined in the Time Period subsection, neither the Contractor nor any of the Contractor’s Affiliates have been convicted of or have received a conditional or an absolute discharge, under any foreign offence that Canada deems to be of similar constitutive elements to the offences listed in these Integrity Provisions. Canada will also consider foreign measures declared by Canada to be similar in nature to the Canadian pardon, record suspension, or restoration of capacities by the Governor in Council.
    10. Subcontractors
      The Contractor must ensure that subcontracts include Integrity Provisions no less favourable to Canada than those imposed in the Contract.
    11. Non-application
      For governments, as well as entities controlled by a government, including Crown corporations, the present Integrity Provisions are reduced to complying with article 750 of the Criminal Code, the Government Contracts Regulations and the Code of Conduct for Procurement.

    2030 44 (2008-05-12) Entire Agreement

    The Contract constitutes the entire and only agreement between the Parties and supersedes all previous negotiations, communications and other agreements, whether written or oral, unless they are incorporated by reference in the Contract. There are no terms, covenants, representations, statements or conditions binding on the Parties other than those contained in the Contract.