ARCHIVED Contract Approval and Signing Authority Limits - Revised Construction and Architectural and Engineering Limits

Attention! We’ve Moved! The Supply Manual has moved to the CanadaBuys website. Check out the new landing page for the Supply Manual.

Attention! We’ve Moved! The SACC has been archived and moved to the CanadaBuys website. Check out the new landing page for the archived SACC manual

Archived Content

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

Item Information

Introduction

The purpose of Policy Notification (PN)-87U is to update the authority limits for Construction and Architectural and Engineering Services.

Background

Temporary authority limits were provided for Construction and Architectural and Engineering Services in support of the Accelerated Infrastructure Program. These limits are in effect from April 1, 2009 to March 31, 2011. On April 1, 2011, new approval and signing authority limits will come into effect and will require new delegation forms for all positions requiring Construction and Architectural and Engineering Services authorities. Any new procurement or procurement in progress as of April 1, 2011 must use the new limits.

Effective Date

This PN is effective immediately.

Revisions to the Current Policy

Approval and Signing Authority Limits for Construction and Architectural and Engineering Services have been revised and replace the temporary limits put in place for the Accelerated Infrastructure Program. The revised limits are effective April 1, 2011. Annex A contains the changes to the Supply Manual.

Contact Person

For more information on the Supply Manual changes, contact Susan Blakeney, by phone at 819-956-8235, or by e-mail at: susan.blakeney@tpsgc-pwgsc.gc.ca.

Annex A - Changes to the Supply Manual
Annex 6.4.2: Basic Contracting Limits

CONSTRUCTION - Contract Approval and Signing Authority Limits

This table entitled CONSTRUCTION - Contract Approval and Signing Authority Limits provides contract entry, amendment, and signing authority limits for Electronic, Competitive and Non-competitive Construction procurement.

Level Position Electronic Competitive Non-competitive
    Approval Signing Approval Signing Approval Signing
    Contract Entry Aggreg. Amend.   Contract Entry Aggreg. Amend.   Contract Entry Aggreg. Amend.  
Minister $20M $10M Full $10M $5M Full $500K $500K Full
1. ADM $20M $10M Full $10M $5M Full $500K $500K Full
DG, RDG $15M $1.5M Full $7.5M $1.5M Full $300K $300K Full
Sr. Director Regional Director $10M $1M Full $5M $1M Full $200K $200K Full
2 Director $5M $400K Full $2.5M $400K Full $125K $125K Full
Manager $2.5M $200K Full $1M $200K Full $125K $100K Full
3 Supply Team Leader $1M $100K C: $5M
A: $400K
$400K $100K C: $2.5M
A: $400K
$100K $50K C: $125K
A: $125K
Supply Specialist $300K $50K C: $2.5M
A: $200K
$300K $50K C: $1M
A: $200K
$50K $25K C: $125K
A: $100K
4 Supply Officer $100K $15K C: $1M
A: $100K
$100K $15K C: $400K
A: $100K
$25K $15K C: $100K
A: $50K
Intern Officer/ Trainee                  
Sr. Purchasing Assistant                  
Proc. Assistant                  

Legend:
C = Contract Signing Authority
A = Aggregate Contract Amendment Signing Authority

Annex 6.4.2: Basic Contracting Limits

A&E SERVICES - Contract Approval and Signing Authority Limits

This table entitled A&E SERVICES - Contract Approval and Signing Authority Limits, provides contract entry, amendment and signing authority limits for Electronic, Competitive and Non-competitive A&E Services procurement.

Level Position Electronic Competitive Non-competitive
    Approval Signing Approval Signing Approval Signing
    Contract Entry Aggreg. Amend. . Contract Entry Aggreg. Amend.   Contract Entry Aggreg. Amend.  
Minister $2M Greater of $1M or 25% of original Max. $2M
Note 1
Full $1M Greater of $250K or 25% of original Max. $1M
Note 2
Full $100K $100K
$100K1
Full
1. ADM $2M Greater of $1M or 25% of original Max. $2M
Note 1
Full $1M Greater of $250K or 25% of original Max. $1M
Note 2
Full $100K $100K
$100K 1
Full
DG, RDG $1.5M $750K Full $750K Greater of $125K or 25% of original Max. $500K Full $80K $80K Full
Sr. Director Regional Director $1M $500K Full $500K $125K Full $80K $80K Full
2 Director $500K $50K Full $500K $50K Full $50K $50K Full
Manager $500K $50K Full $500K $50K Full $50K $50K Full
3 Supply Team Leader $350K $50K C:$500K
A:$ 50K
$350K $50K C:$500K
A:$50K
$50K $50K C:$50K
A:$50K
Supply Specialist $200K $50K C:$500K
A:$50K
$200K $50K C:$500K
A:$50K
$40K $25K C:$50K
A:$50K
4 Supply Officer $125K $25K C:$350K
A:$50K
$70K $25K C:$350K
A:$50K
$25K $10K C:$50K
A:$50K
Intern Officer/ Trainee                  
Sr. Purchasing Assistant                  
Proc. Assistant                  

Legend:
C = Contract Signing Authority
A = Aggregate Contract Amendment Signing Authority

Note 1 - Authority to issue subsequent amendments to an amendment approved by Treasury Board: Greater of $250K or 25% of original approval up to maximum of $1M

Note 2 - Authority to issue subsequent amendments to an amendment approved by Treasury Board: Greater of $125K or 25% of original approval up to maximum of $500K

1 - Authority to issue subsequent amendments to an amendment approved by Treasury Board to maximum limit shown