AECOM CANADA LTD (EP922-171951/003/PWU~001) |
001 |
CAD 500 000.00 |
2017/06/01 |
AECOM CANADA LTD (EP922-171951/003/PWU~002) |
002 |
CAD 0.00 |
2017/07/06 |
AECOM CANADA LTD (EP922-171951/003/PWU~003) |
003 |
CAD 602 500.00 |
2018/12/14 |
AECOM CANADA LTD (EP922-171951/003/PWU~004) |
004 |
CAD 0.00 |
2019/04/05 |
AECOM CANADA LTD (EP922-171951/003/PWU~005) |
005 |
CAD 0.00 |
2021/04/06 |
AECOM CANADA LTD (EP922-171951/003/PWU~006) |
006 |
CAD 0.00 |
2021/04/09 |
AECOM CANADA LTD (EP922-171951/003/PWU~007) |
007 |
CAD 0.00 |
2022/05/18 |
AECOM CANADA LTD (EP922-171951/007/PWU~001) |
001 |
CAD 500 000.00 |
2017/06/01 |
AECOM CANADA LTD (EP922-171951/007/PWU~002) |
002 |
CAD 0.00 |
2017/07/06 |
AECOM CANADA LTD (EP922-171951/007/PWU~003) |
003 |
CAD 602 500.00 |
2018/12/14 |
AECOM CANADA LTD (EP922-171951/007/PWU~004) |
004 |
CAD 0.00 |
2019/04/05 |
AECOM CANADA LTD (EP922-171951/007/PWU~005) |
005 |
CAD 0.00 |
2021/04/06 |
AECOM CANADA LTD (EP922-171951/007/PWU~006) |
006 |
CAD 0.00 |
2021/04/09 |
AECOM CANADA LTD (EP922-171951/007/PWU~007) |
007 |
CAD 0.00 |
2022/05/18 |
AECOM CANADA LTD (EP922-171951/011/PWU~001) |
001 |
CAD 200 000.00 |
2017/06/01 |
AECOM CANADA LTD (EP922-171951/011/PWU~002) |
002 |
CAD 0.00 |
2017/07/06 |
AECOM CANADA LTD (EP922-171951/011/PWU~003) |
003 |
CAD 0.00 |
2017/07/18 |
AECOM CANADA LTD (EP922-171951/011/PWU~004) |
004 |
CAD 210 000.00 |
2018/11/22 |
AECOM CANADA LTD (EP922-171951/011/PWU~005) |
005 |
CAD 251 500.00 |
2018/12/14 |
AECOM CANADA LTD (EP922-171951/011/PWU~006) |
006 |
CAD 0.00 |
2019/04/05 |
AECOM CANADA LTD (EP922-171951/011/PWU~007) |
007 |
CAD 0.00 |
2021/04/06 |
AECOM CANADA LTD (EP922-171951/011/PWU~008) |
008 |
CAD 0.00 |
2021/04/09 |
AECOM CANADA LTD (EP922-171951/011/PWU~009) |
009 |
CAD 0.00 |
2022/05/18 |
AECOM CANADA LTD (EP922-171951/015/PWU~001) |
001 |
CAD 300 000.00 |
2017/06/01 |
AECOM CANADA LTD (EP922-171951/015/PWU~002) |
002 |
CAD 0.00 |
2017/07/06 |
AECOM CANADA LTD (EP922-171951/015/PWU~003) |
003 |
CAD 0.00 |
2017/07/18 |
AECOM CANADA LTD (EP922-171951/015/PWU~004) |
004 |
CAD 30 750.00 |
2018/12/14 |
AECOM CANADA LTD (EP922-171951/015/PWU~005) |
005 |
CAD 0.00 |
2019/04/05 |
AECOM CANADA LTD (EP922-171951/015/PWU~006) |
006 |
CAD 0.00 |
2021/04/06 |
AECOM CANADA LTD (EP922-171951/015/PWU~007) |
007 |
CAD 0.00 |
2021/04/09 |
AECOM CANADA LTD (EP922-171951/015/PWU~008) |
008 |
CAD 0.00 |
2022/05/18 |
AECOM CANADA LTD (EP922-171951/019/PWU~001) |
001 |
CAD 500 000.00 |
2017/06/01 |
AECOM CANADA LTD (EP922-171951/019/PWU~002) |
002 |
CAD 0.00 |
2017/07/06 |
AECOM CANADA LTD (EP922-171951/019/PWU~003) |
003 |
CAD 602 500.00 |
2018/12/14 |
AECOM CANADA LTD (EP922-171951/019/PWU~004) |
004 |
CAD 0.00 |
2019/04/05 |
AECOM CANADA LTD (EP922-171951/019/PWU~005) |
005 |
CAD 0.00 |
2021/04/06 |
AECOM CANADA LTD (EP922-171951/019/PWU~006) |
006 |
CAD 0.00 |
2021/04/09 |
AECOM CANADA LTD (EP922-171951/019/PWU~007) |
007 |
CAD 0.00 |
2022/05/18 |
DGH ENGINEERING LTD (EP922-171951/001/PWU~001) |
001 |
CAD 857 143.00 |
2017/06/01 |
DGH ENGINEERING LTD (EP922-171951/001/PWU~002) |
002 |
CAD 1 032 857.00 |
2018/12/14 |
DGH ENGINEERING LTD (EP922-171951/001/PWU~003) |
003 |
CAD 0.00 |
2019/04/05 |
DGH ENGINEERING LTD (EP922-171951/001/PWU~004) |
004 |
CAD 0.00 |
2021/04/06 |
DGH ENGINEERING LTD (EP922-171951/001/PWU~005) |
005 |
CAD 0.00 |
2022/05/18 |
DGH Engineering Ltd (EP922-171951/001/PWU~006) |
006 |
CAD 0.00 |
2017/06/01 |
DGH ENGINEERING LTD (EP922-171951/005/PWU~001) |
001 |
CAD 857 143.00 |
2017/06/01 |
DGH ENGINEERING LTD (EP922-171951/005/PWU~002) |
002 |
CAD 1 032 857.00 |
2018/12/14 |
DGH ENGINEERING LTD (EP922-171951/005/PWU~003) |
003 |
CAD 0.00 |
2019/04/05 |
DGH ENGINEERING LTD (EP922-171951/005/PWU~004) |
004 |
CAD 0.00 |
2021/04/06 |
DGH ENGINEERING LTD (EP922-171951/005/PWU~005) |
005 |
CAD 0.00 |
2022/05/18 |
DGH ENGINEERING LTD (EP922-171951/009/PWU~001) |
001 |
CAD 342 857.00 |
2017/06/01 |
DGH ENGINEERING LTD (EP922-171951/009/PWU~002) |
002 |
CAD 0.00 |
2017/07/18 |
DGH ENGINEERING LTD (EP922-171951/009/PWU~003) |
003 |
CAD 360 000.00 |
2018/11/22 |
DGH ENGINEERING LTD (EP922-171951/009/PWU~004) |
004 |
CAD 431 143.00 |
2018/12/14 |
DGH ENGINEERING LTD (EP922-171951/009/PWU~005) |
005 |
CAD 0.00 |
2019/04/05 |
DGH ENGINEERING LTD (EP922-171951/009/PWU~006) |
006 |
CAD 0.00 |
2021/04/06 |
DGH ENGINEERING LTD (EP922-171951/009/PWU~007) |
007 |
CAD 0.00 |
2022/05/18 |
DGH ENGINEERING LTD (EP922-171951/013/PWU~001) |
001 |
CAD 514 286.00 |
2017/06/01 |
DGH ENGINEERING LTD (EP922-171951/013/PWU~002) |
002 |
CAD 52 714.00 |
2018/12/14 |
DGH ENGINEERING LTD (EP922-171951/013/PWU~003) |
003 |
CAD 0.00 |
2019/04/05 |
DGH ENGINEERING LTD (EP922-171951/013/PWU~004) |
004 |
CAD 0.00 |
2021/04/06 |
DGH ENGINEERING LTD (EP922-171951/013/PWU~005) |
005 |
CAD 0.00 |
2022/05/18 |
DGH ENGINEERING LTD (EP922-171951/017/PWU~001) |
001 |
CAD 857 143.00 |
2017/06/01 |
DGH ENGINEERING LTD (EP922-171951/017/PWU~002) |
002 |
CAD 1 032 857.00 |
2018/12/14 |
DGH ENGINEERING LTD (EP922-171951/017/PWU~003) |
003 |
CAD 0.00 |
2019/04/05 |
DGH ENGINEERING LTD (EP922-171951/017/PWU~004) |
004 |
CAD 0.00 |
2021/04/06 |
DGH ENGINEERING LTD (EP922-171951/017/PWU~005) |
005 |
CAD 0.00 |
2022/05/18 |
DGH Engineering Ltd (EP922-171951/017/PWU~006) |
006 |
CAD 0.00 |
2017/06/01 |
SNC-LAVALIN INC (EP922-171951/002/PWU~001) |
001 |
CAD 666 667.00 |
2017/06/01 |
SNC-LAVALIN INC (EP922-171951/002/PWU~002) |
002 |
CAD 803 333.00 |
2018/12/14 |
SNC-LAVALIN INC (EP922-171951/002/PWU~003) |
003 |
CAD 0.00 |
2019/04/05 |
SNC-LAVALIN INC (EP922-171951/002/PWU~004) |
004 |
CAD 0.00 |
2021/04/06 |
SNC-LAVALIN INC (EP922-171951/002/PWU~005) |
005 |
CAD 0.00 |
2022/05/18 |
SNC-LAVALIN INC (EP922-171951/006/PWU~001) |
001 |
CAD 666 667.00 |
2017/06/01 |
SNC-LAVALIN INC (EP922-171951/006/PWU~002) |
002 |
CAD 803 333.00 |
2018/12/14 |
SNC-LAVALIN INC (EP922-171951/006/PWU~003) |
003 |
CAD 0.00 |
2019/04/05 |
SNC-LAVALIN INC (EP922-171951/006/PWU~004) |
004 |
CAD 0.00 |
2021/04/06 |
SNC-LAVALIN INC (EP922-171951/006/PWU~005) |
005 |
CAD 0.00 |
2022/05/18 |
SNC-LAVALIN INC (EP922-171951/010/PWU~001) |
001 |
CAD 266 667.00 |
2017/06/01 |
SNC-LAVALIN INC (EP922-171951/010/PWU~002) |
002 |
CAD 0.00 |
2017/07/18 |
SNC-LAVALIN INC (EP922-171951/010/PWU~003) |
003 |
CAD 280 000.00 |
2018/11/22 |
SNC-LAVALIN INC (EP922-171951/010/PWU~004) |
004 |
CAD 335 333.00 |
2018/12/14 |
SNC-LAVALIN INC (EP922-171951/010/PWU~005) |
005 |
CAD 0.00 |
2019/04/05 |
SNC-LAVALIN INC (EP922-171951/010/PWU~006) |
006 |
CAD 0.00 |
2021/04/06 |
SNC-LAVALIN INC (EP922-171951/010/PWU~007) |
007 |
CAD 0.00 |
2022/05/18 |
SNC-LAVALIN INC (EP922-171951/014/PWU~001) |
001 |
CAD 400 000.00 |
2017/06/01 |
SNC-LAVALIN INC (EP922-171951/014/PWU~002) |
002 |
CAD 0.00 |
2017/07/18 |
SNC-LAVALIN INC (EP922-171951/014/PWU~003) |
003 |
CAD 41 000.00 |
2018/12/14 |
SNC-LAVALIN INC (EP922-171951/014/PWU~004) |
004 |
CAD 0.00 |
2019/04/05 |
SNC-LAVALIN INC (EP922-171951/014/PWU~005) |
005 |
CAD 0.00 |
2021/04/06 |
SNC-LAVALIN INC (EP922-171951/014/PWU~006) |
006 |
CAD 0.00 |
2022/05/18 |
SNC-LAVALIN INC (EP922-171951/018/PWU~001) |
001 |
CAD 666 667.00 |
2017/06/01 |
SNC-LAVALIN INC (EP922-171951/018/PWU~002) |
002 |
CAD 803 333.00 |
2018/12/14 |
SNC-LAVALIN INC (EP922-171951/018/PWU~003) |
003 |
CAD 0.00 |
2019/04/05 |
SNC-LAVALIN INC (EP922-171951/018/PWU~004) |
004 |
CAD 0.00 |
2021/04/06 |
SNC-LAVALIN INC (EP922-171951/018/PWU~005) |
005 |
CAD 0.00 |
2022/05/18 |
STANTEC CONSULTING LTD (EP922-171951/008/PWU~001) |
001 |
CAD 357 143.00 |
2017/06/01 |
STANTEC CONSULTING LTD (EP922-171951/008/PWU~002) |
002 |
CAD 0.00 |
2017/07/18 |
STANTEC CONSULTING LTD (EP922-171951/008/PWU~003) |
003 |
CAD 430 357.00 |
2018/12/14 |
STANTEC CONSULTING LTD (EP922-171951/008/PWU~004) |
004 |
CAD 0.00 |
2019/04/05 |
STANTEC CONSULTING LTD (EP922-171951/008/PWU~005) |
005 |
CAD 0.00 |
2021/04/06 |
STANTEC CONSULTING LTD (EP922-171951/008/PWU~006) |
006 |
CAD 0.00 |
2022/05/18 |
STANTEC CONSULTING LTD (EP922-171951/008/PWU~007) |
007 |
CAD 0.00 |
2022/07/19 |
STANTEC CONSULTING LTD (EP922-171951/016/PWU~001) |
001 |
CAD 214 286.00 |
2017/06/01 |
STANTEC CONSULTING LTD (EP922-171951/016/PWU~002) |
002 |
CAD 0.00 |
2017/07/18 |
STANTEC CONSULTING LTD (EP922-171951/016/PWU~003) |
003 |
CAD 21 964.00 |
2018/12/14 |
STANTEC CONSULTING LTD (EP922-171951/016/PWU~004) |
004 |
CAD 0.00 |
2019/04/05 |
STANTEC CONSULTING LTD (EP922-171951/016/PWU~005) |
005 |
CAD 0.00 |
2021/04/06 |
STANTEC CONSULTING LTD (EP922-171951/016/PWU~006) |
006 |
CAD 0.00 |
2022/05/18 |
STANTEC CONSULTING LTD (EP922-171951/016/PWU~007) |
007 |
CAD 0.00 |
2022/07/19 |
STANTEC CONSULTING LTD (EP922-171951/020/PWU~001) |
001 |
CAD 357 143.00 |
2017/06/01 |
STANTEC CONSULTING LTD (EP922-171951/020/PWU~002) |
002 |
CAD 0.00 |
2017/07/18 |
STANTEC CONSULTING LTD (EP922-171951/020/PWU~003) |
003 |
CAD 430 357.00 |
2018/12/14 |
STANTEC CONSULTING LTD (EP922-171951/020/PWU~004) |
004 |
CAD 0.00 |
2019/04/05 |
STANTEC CONSULTING LTD (EP922-171951/020/PWU~005) |
005 |
CAD 0.00 |
2021/04/06 |
STANTEC CONSULTING LTD (EP922-171951/020/PWU~006) |
006 |
CAD 0.00 |
2022/05/18 |
STANTEC CONSULTING LTD (EP922-171951/020/PWU~007) |
007 |
CAD 0.00 |
2022/07/19 |
WSP (EP922-171951/004/PWU~001) |
001 |
CAD 357 143.00 |
2017/06/01 |
WSP (EP922-171951/004/PWU~002) |
002 |
CAD 0.00 |
2017/07/18 |
WSP (EP922-171951/004/PWU~003) |
003 |
CAD 430 357.00 |
2018/12/14 |
WSP (EP922-171951/004/PWU~004) |
004 |
CAD 0.00 |
2019/04/05 |
WSP (EP922-171951/004/PWU~005) |
005 |
CAD 0.00 |
2021/04/06 |
WSP (EP922-171951/004/PWU~006) |
006 |
CAD 0.00 |
2022/05/18 |
WSP (EP922-171951/012/PWU~001) |
001 |
CAD 142 857.00 |
2017/06/01 |
WSP (EP922-171951/012/PWU~002) |
002 |
CAD 0.00 |
2017/07/18 |
WSP (EP922-171951/012/PWU~003) |
003 |
CAD 150 000.00 |
2018/11/22 |
WSP (EP922-171951/012/PWU~004) |
004 |
CAD 179 643.00 |
2018/12/14 |
WSP (EP922-171951/012/PWU~005) |
005 |
CAD 0.00 |
2019/04/05 |
WSP (EP922-171951/012/PWU~006) |
006 |
CAD 0.00 |
2021/04/06 |
WSP (EP922-171951/012/PWU~007) |
007 |
CAD 0.00 |
2022/05/18 |